Mechanical bypass system Installation for the Phase A power supply - #50308

6 hours
Complete
Complete

The maintenance is now complete. Thanks for your patience.

Underway

The scheduled maintenance is now underway. We'll keep you updated on our progress.

Scheduled

Scope of work: Mechanical bypass system Installation for the Phase A power supply Impact: No impact is expected MOP: Maintenance will be performed on one power feed at a time. During the work window, only one power feed will remain active Important note: During this Installation, there will be a planned shutdown of Feed A. Consequently, there is a risk of power loss to any equipment that is not properly dual-homed (redundantly powered). Please verify the following prior

  • All equipment is connected to dual power feeds (A+B).
  • There is no power overload on any of the PDU banks.
  • All power supply units (PSUs) are functional and operating as required. If you have any further inquiries regarding this work, please do not hesitate to contact us.
Avatar for Dmitry Sherman
Dmitry Sherman
Affected components
  • Tel Aviv HaShacham
    • BEZEQINT (ISP)
    • BEZEQINT-NG (ISP)
    • DARKFIBER 2 (ISP)
    • VM CLUSTER
    • core switch l3 - ar-sh7280-1
    • core switch l3 - ar-sh7280-2
    • Nyon (ISP)