We would like to inform you about an emergency planned work scheduled in Shacham Tech Data Center.

PW Reference Number: 46042 Location: SHACHAM 40 Datacenter.

Maintenance Window: Start date/time (UTC): 11-05-2025 03:00 End date/time (UTC): 11-05-2025 17:00

Scope of work: High Voltage Power Distributor Replacement During the Maintenance all power consumption will be transferred to Generators. After Replacement of the Power Distributor the Data Center will retransfer back to the Electric Company Power.

Impact: no impact expected.

Low risk of losing power on leg A or B due to fault while on Generators power.