Dear Customer,
We would like to inform you about an emergency planned work scheduled in Shacham Tech Data Center.
PW Reference Number: 46042 Location: SHACHAM 40 Datacenter.
Maintenance Window: Start date/time (UTC): 11-05-2025 03:00 End date/time (UTC): 11-05-2025 17:00
Scope of work: High Voltage Power Distributor Replacement During the Maintenance all power consumption will be transferred to Generators. After Replacement of the Power Distributor the Data Center will retransfer back to the Electric Company Power.
Impact: no impact expected.
Low risk of losing power on leg A or B due to fault while on Generators power.
Always at your service, Interhost
We’ll find your subscription and send you a link to login to manage your preferences.
We’ve found your existing subscription and have emailed you a secure link to manage your preferences.
We’ll use your email to save your preferences so you can update them later.
Subscribe to other services using the bell icon on the subscribe button on the status page.
You’ll no long receive any status updates from Interhost Global Status, are you sure?
{{ error }}
We’ll no longer send you any status updates about Interhost Global Status.